Skip to content
EES

📍 NEOM, Tabuk Province

Lifting Equipment Inspection & Load Testing in NEOM

Proof load testing and thorough examination of lifting appliances and accessories, performed by competent persons and documented to client and international standards. The giga-project in north-west Saudi Arabia, mobilising vast fleets of heavy equipment and workers.

Lifting Equipment Inspection in NEOM: local context

NEOM is a remote, greenfield giga-project in north-west Saudi Arabia, so lifting and heavy equipment is commonly mobilised from distant yards and has to be proven fit before it starts work at The Line, Oxagon or Sindalah. EES provides third-party inspection on site, with inspection reports, certificates and inspection tags that typically support pre-mobilisation checks and contractor handovers without holding up the programme.

What we deliver in NEOM

  • ✓Static and dynamic load testing of cranes, hoists and lifting appliances
  • ✓Thorough examination of wire rope, chain and web slings, shackles, hooks and spreader beams
  • ✓Overhead / gantry crane and mobile crane testing
  • ✓Tower crane inspection at erection and periodically
  • ✓Safe working load (SWL) verification and marking

Standards

  • ✓ASME B30.2 / B30.5 / B30.9
  • ✓LOLER principles
  • ✓Saudi Aramco General Instructions (GI)
  • ✓ISO 4309 (wire rope)

Documentation

  • ✓Load test certificate
  • ✓Thorough examination report
  • ✓SWL / colour-code tagging
  • ✓Equipment register

Read the full Lifting Equipment Inspection service overview →

FAQs

Do you provide Lifting Equipment Inspection in NEOM?+

Yes. EES provides Lifting Equipment Inspection at client sites in NEOM, including The Line, Oxagon and Sindalah. Contact us with your requirement and we will confirm scope and scheduling.

Which standards and documents apply to Lifting Equipment Inspection in NEOM?+

Work in NEOM is aligned with the following standards and references: ASME B30.2 / B30.5 / B30.9; LOLER principles; Saudi Aramco General Instructions (GI); ISO 4309 (wire rope). On completion you receive: Load test certificate; Thorough examination report; SWL / colour-code tagging.

What is a load test?+

A load test applies a controlled test load (typically 100%–125% of SWL depending on the standard) to prove the structural and mechanical integrity of lifting equipment.

Do you test lifting accessories as well as cranes?+

Yes — slings, shackles, hooks, chain blocks, spreader beams and other lifting gear are examined and certified.

Book Lifting Equipment Inspection in NEOM